Back to Projects

Residential

Fuvahmulah · Gnaviyani Atoll

Installed Sep 21, 2024

Roshaneegea

Imported from the legacy Bright Vision website. Review this draft and update the description, category, and installed date before publishing.

System Size

11kW

Annual Generation

17.2 MWh

Installed Date

Sep 21, 2024

Address

Gn. Fuvahmulah

Kulheyfa

Technical Overview

Sector
Residential
Atoll
Gnaviyani Atoll
Island
Fuvahmulah
Address
Gn. Fuvahmulah
Installed Capacity
11kW
Installed Date
Sep 21, 2024

Project Description

Imported from the legacy Bright Vision website. Review this draft and update the description, category, and installed date before publishing.

Impact Snapshot

Annual Generation

17.2 MWh

CO2 Avoided

12.6 t/year

Standard Coal Saved

5.1 t/year

Deforestation Reduced

570 trees/year eq.

Related Projects

Explore similar installations by sector and delivery profile.

Curious about the cost?

Get a tailored estimate in minutes. We analyze your roof size and current electricity bill to give you a precise quote, not a guess.

No commitment required. 100% free consultation.