Nookokaage
Imported from the legacy Bright Vision website. Review this draft and update the description, category, and installed date before publishing.
System Size
12.76kW
Annual Generation
19.9 MWh
Installed Date
Dec 4, 2024
Address
Ha.Uligan

Technical Overview
- Sector
- Residential
- Atoll
- Gnaviyani Atoll
- Island
- Fuvahmulah
- Address
- Ha.Uligan
- Installed Capacity
- 12.76kW
- Installed Date
- Dec 4, 2024
Project Description
Imported from the legacy Bright Vision website. Review this draft and update the description, category, and installed date before publishing.
Impact Snapshot
Annual Generation
19.9 MWh
CO2 Avoided
14.6 t/year
Standard Coal Saved
6 t/year
Deforestation Reduced
660 trees/year eq.
Related Projects
Explore similar installations by sector and delivery profile.



