Fulooniyaage
Imported from the legacy Bright Vision website. Review this draft and update the description, category, and installed date before publishing.
System Size
7.9kW
Annual Generation
12.3 MWh
Installed Date
Dec 2, 2024
Address
M.Kolhufushi

Technical Overview
- Sector
- Residential
- Atoll
- Meemu Atoll
- Island
- Kolhufushi
- Address
- M.Kolhufushi
- Installed Capacity
- 7.9kW
- Installed Date
- Dec 2, 2024
Project Description
Imported from the legacy Bright Vision website. Review this draft and update the description, category, and installed date before publishing.
Impact Snapshot
Annual Generation
12.3 MWh
CO2 Avoided
9 t/year
Standard Coal Saved
3.7 t/year
Deforestation Reduced
408 trees/year eq.