Engaa
Imported from the legacy Bright Vision website. Review this draft and update the description, category, and installed date before publishing.
System Size
8.5kW
Annual Generation
13.3 MWh
Installed Date
Jul 6, 2024
Address
Fuvahmulah

Technical Overview
- Sector
- Residential
- Atoll
- Gnaviyani Atoll
- Island
- Fuvahmulah
- Address
- Fuvahmulah
- Installed Capacity
- 8.5kW
- Installed Date
- Jul 6, 2024
Project Description
Imported from the legacy Bright Vision website. Review this draft and update the description, category, and installed date before publishing.
Impact Snapshot
Annual Generation
13.3 MWh
CO2 Avoided
9.7 t/year
Standard Coal Saved
4 t/year
Deforestation Reduced
441 trees/year eq.
Related Projects
Explore similar installations by sector and delivery profile.



