Abadha Hiyaa
Imported from the legacy Bright Vision website. Review this draft and update the description, category, and installed date before publishing.
System Size
8.9kW
Annual Generation
13.9 MWh
Installed Date
Sep 19, 2024
Address
S.Hithadhoo

Technical Overview
- Sector
- Residential
- Atoll
- Seenu Atoll
- Island
- Hithadhoo
- Address
- S.Hithadhoo
- Installed Capacity
- 8.9kW
- Installed Date
- Sep 19, 2024
Project Description
Imported from the legacy Bright Vision website. Review this draft and update the description, category, and installed date before publishing.
Impact Snapshot
Annual Generation
13.9 MWh
CO2 Avoided
10.2 t/year
Standard Coal Saved
4.2 t/year
Deforestation Reduced
461 trees/year eq.
Related Projects
Explore similar installations by sector and delivery profile.



