Aakan
Imported from the legacy Bright Vision website. Review this draft and update the description, category, and installed date before publishing.
System Size
9.8kW
Annual Generation
15.3 MWh
Installed Date
Aug 14, 2024
Address
S.Hithadhoo

Technical Overview
- Sector
- Residential
- Atoll
- Seenu Atoll
- Island
- Hithadhoo
- Address
- S.Hithadhoo
- Installed Capacity
- 9.8kW
- Installed Date
- Aug 14, 2024
Project Description
Imported from the legacy Bright Vision website. Review this draft and update the description, category, and installed date before publishing.
Impact Snapshot
Annual Generation
15.3 MWh
CO2 Avoided
11.2 t/year
Standard Coal Saved
4.6 t/year
Deforestation Reduced
507 trees/year eq.
Related Projects
Explore similar installations by sector and delivery profile.



